Account deck prepared for National Building Services to present to Martin Brower.Martin Brower photography and screenshots are used for this meeting only, pending their approval.
Building Data IntelligenceBuyer Hub
Buyer Hub

Account deck · Martin Brower

Martin Brower deck: change log

Building Data Intelligence, presented by National Building Services. Built from the NBS request to make the deck specific to Martin Brower's operation, assets and risks.

Slides
19
Updated
1 Oct 2026
Presented by
NBS
Open the deck Use the arrow keys to move through the slides.
Cover slide: Protecting Martin Brower's cold chain. Asset intelligence for every critical system on site. Prepared for Martin Brower, presented by National Building Services.

Current version

All 19 slides

Slides marked "New" were added in response to the NBS request.

  1. 01Cover
  2. 02Martin BrowerNew
  3. 03UK & Ireland sitesNew
  4. 04OperationsNew
  5. 05In our wordsNew
  6. 06The riskNew
  7. 07What BDI does
  8. 08RefrigerationNew
  9. 09Critical assetsNew
  10. 10The platform
  11. 11Meet WinstonNew
  12. 12Today vs with BDINew
  13. 13Use case 1New
  14. 14Use case 2New
  15. 15Use case 3New
  16. 16NBS integrationNew
  17. 17Track record
  18. 18Next steps
  19. 19Closing messageNew

History

Change log

Newest first. Slide numbers refer to the deck at the time of each change.

Version 2.7 · 19 slides

Audited against the original NBS request

  • Every line of the request re-checked against the slides, not the notes. Four things had slipped and are fixed. The cross-check below is updated to match.
  • "Building systems" restored to the introduction: "Built on refrigeration, cold storage and building systems". Slide 2
  • "Compliance" restored to the risk slide: "Food safety, compliance and product integrity". Slide 6
  • Asset columns regrouped to the request's own taxonomy: HVAC, Electrical (distribution boards, MCCs, generators, critical power) and Docks & BMS (dock equipment, loading doors, BMS). Slide 9
  • Results labelled "Track record" rather than "Outcomes", so BDI's published one-year figures cannot be read as a projection for Martin Brower. Slide 17
  • Smaller supporting text on the Winston video slide and the operations photo captions, so the video and the photographs lead. Slides 4, 11
  • Download PDF from the deck itself: a quiet button in the top-right corner of the closing slide. It does not appear in the PDF. Slide 19
Version 2.6 · 19 slides

Slide 5 in BDI's voice

  • "In their words" is now "In our words". The slide states BDI's promise to Martin Brower directly: what we do, and what it gives them. The Brand Protection screenshot stays as the reference point, not the script. Slide 5
Version 2.5 · 19 slides

Next steps restored

  • Next steps are now platform demo, site survey and proposal, in that order. The 90-day proof of value has been parked until a trial is agreed; its five measures stay in the speaker notes. The Prepared for / Presented by logos have come off this slide. Slide 18
  • The two closing slides now do different jobs: slide 18 is what happens after the meeting, slide 19 is how NBS and BDI help Martin Brower, with Frank's contact details. Slides 18, 19
Version 2.4 · 19 slides

Winston video, page numbers and NBS contact

  • Winston video reinstated. The 30-second product clip is back on its own slide, introduced as a video that plays on its own. The PDF shows its opening frame and a link to watch it online. Slide 11
  • Page numbers on every slide except the cover, small, bottom left. The corner now carries an NBS × BDI mark.
  • NBS contact on the closing slide: Frank Glenn, Managing Director, with phone, mobile, email and website. Slide 19
  • Operations slide explained: a line on what the three photographs show and why, with a caption under each. Slide 4
  • "In their words" rebuilt: the headline now says why Martin Brower's own promise matters, with two rows setting their promise beside BDI's, next to the screenshot. Slide 5
  • Available as a PDF from this page, one slide per page.
Version 2.3 · 18 slides

Closing message and final polish

  • New closing slide. It states the NBS closing line as requested: protect their cold chain, improve asset reliability and reduce operational risk. Slide 19
  • Martin Brower logo added to the UK & Ireland site map. Slide 3
  • NBS logo enlarged by 50% on the cover and on the proof-of-value slide. Slides 1, 18
  • Image credits appendix removed. The deck now ends on the proof of value, then the closing message.
  • Cross-check published. Every point in the NBS request is mapped to the slide that answers it, as shown below.
Version 2.2 · 18 slides

Martin Brower's own imagery

  • Generic plant photos replaced with Martin Brower's own photography: a cold-store operative, warehouse racking, the control room and a UK yard. Slides 8, 9
  • New slide, "In Martin Brower's words". A screenshot of their Brand Protection page shows the promise to anticipate risk that BDI extends to the plant. Slide 5
  • Critical-asset columns retitled as HVAC, Power & controls, and Docks & yard, with every asset from the NBS request kept. Slide 9
Version 2.0 · 17 slides

Rebuilt around the NBS request

  • Martin Brower first. A new introduction, a UK & Ireland site map, an operations slide and a risk slide come before any platform content. Slides 2–6
  • Asset examples tailored to refrigeration, HVAC, electrical and other critical assets. Slides 8, 9
  • Current state versus future state added. Slide 12
  • Three Martin Brower use cases: refrigeration failure prevention, reducing reactive maintenance, and energy management. Slides 13–15
  • NBS integration: BDI → NBS CAFM → Engineer response → Closed work order. Slide 16
  • Close rebuilt around a 90-day proof of value with five measures (since reverted, see 2.5). Slide 18
  • Removed from the generic deck: the Winston video, the roadmap and the Kronos detail.
Version 1.0 · 10 slides

First Martin Brower version

  • Created from the NBS client template, with Martin Brower's logo on the cover and the close, and NBS credited as the presenter.
  • Next steps set: site survey, platform demo, proposal.
  • Track record shown in pounds (£132K, £226K, £1.9M), converted from BDI's published US dollar figures.
  • Arrow-key navigation fixed, so each key press moves one slide.

Cross-check

How the NBS request is addressed

Each point in the NBS request, with the slide that answers it and how. Re-audited line by line against the original request on 1 Oct 2026: four wording and grouping fixes came out of it (marked below). Six points are covered in full, one is parked pending agreement, and the remaining gaps relate to imagery.

#NBS requestStatusWhereHow it's addressed
1Martin Brower introduction slideDoneSlides 2, 6Foodservice supply chain, multi-temperature distribution, dependence on refrigeration, cold storage and building systems, and 24/7, where every failure reaches supply. Slide 6 adds the impact on food safety, compliance, product integrity, deliveries and call-outs. Audit fix: "building systems" and "compliance" had slipped off the slides and are back.
2UK & Ireland site overviewDoneSlide 3A map of Darlington, Heywood, Coventry, Hemel Hempstead, Basingstoke and Dublin, with the Martin Brower logo. "Six sites. One cold chain."
2cImages of representative sitesPartialSlide 4Martin Brower's own published photos. None is tied to a named site yet.
3Martin Brower-relevant imagesPartialSlides 1, 2, 4, 5, 8, 9Cold rooms, freezers, racking, warehouse and yard all use Martin Brower's own photography. No photos are published of plant, AHUs, BMS, electrical, docks or vehicle wash.
4Tailored asset examplesDoneSlides 8, 9Every refrigeration, HVAC, electrical and other critical asset in the request, in its own wording. Audit fix: slide 9 is regrouped to the request's own taxonomy (HVAC / Electrical / Docks & BMS), so critical power sits with the electrical assets and BMS with the other critical assets.
5Martin Brower use casesDoneSlides 13–15Refrigeration failure prevention, reducing reactive maintenance, and energy management, each set out as Today versus With BDI.
6NBS integration slideDoneSlide 16BDI → NBS CAFM → Engineer response → Closed work order. "BDI identifies the issue. NBS manages the intervention."
7Current state vs future stateDoneSlide 12Five steps on each side, from "Fault occurs" to "Less disruption".
890-day proof of value closeParkedSlide 18Taken off the slide until a proof-of-value trial is agreed between NBS and Martin Brower. Slide 18 carries the three next steps: platform demo, site survey, proposal. The five suggested measures are kept in the speaker notes, ready to return once agreed.
8aProtect their cold chain, improve asset reliability, reduce operational riskDoneSlide 19A closing slide states the line exactly as requested.

Plant and dock photography

Photos from the site survey would replace the stand-ins on slides 4, 8 and 9.

UK product screenshot

Slide 10 shows BDI's real portfolio view, but it is of US buildings. A UK capture would be better, if one is available.

Image approval

Martin Brower's photos and website screenshot come from martinbrower.co.uk. They need Martin Brower's approval before the deck is used beyond the meeting.