#NBS requestStatusWhereHow it's addressed
1Martin Brower introduction slideDoneSlides 2, 6Foodservice supply chain, multi-temperature distribution, dependence on refrigeration, cold storage and building systems, and 24/7, where every failure reaches supply. Slide 6 adds the impact on food safety, compliance, product integrity, deliveries and call-outs. Audit fix: "building systems" and "compliance" had slipped off the slides and are back.
2UK & Ireland site overviewDoneSlide 3A map of Darlington, Heywood, Coventry, Hemel Hempstead, Basingstoke and Dublin, with the Martin Brower logo. "Six sites. One cold chain."
2cImages of representative sitesPartialSlide 4Martin Brower's own published photos. None is tied to a named site yet.
3Martin Brower-relevant imagesPartialSlides 1, 2, 4, 5, 8, 9Cold rooms, freezers, racking, warehouse and yard all use Martin Brower's own photography. No photos are published of plant, AHUs, BMS, electrical, docks or vehicle wash.
4Tailored asset examplesDoneSlides 8, 9Every refrigeration, HVAC, electrical and other critical asset in the request, in its own wording. Audit fix: slide 9 is regrouped to the request's own taxonomy (HVAC / Electrical / Docks & BMS), so critical power sits with the electrical assets and BMS with the other critical assets.
5Martin Brower use casesDoneSlides 13–15Refrigeration failure prevention, reducing reactive maintenance, and energy management, each set out as Today versus With BDI.
6NBS integration slideDoneSlide 16BDI → NBS CAFM → Engineer response → Closed work order. "BDI identifies the issue. NBS manages the intervention."
7Current state vs future stateDoneSlide 12Five steps on each side, from "Fault occurs" to "Less disruption".
890-day proof of value closeParkedSlide 18Taken off the slide until a proof-of-value trial is agreed between NBS and Martin Brower. Slide 18 carries the three next steps: platform demo, site survey, proposal. The five suggested measures are kept in the speaker notes, ready to return once agreed.
8aProtect their cold chain, improve asset reliability, reduce operational riskDoneSlide 19A closing slide states the line exactly as requested.